Fast erection
Production takes place inside, which completely prevents the structure from absorbing moisture. We package the building components in weatherproof packaging, which allows them to be stored at the construction site in factory packaging. The erection of a weatherproof house takes only a few days. Immediately after the house has been erected special works may be started, which can be performed at the same time as the joints of the structure are being sealed or as the balconies or terrace elements are being installed. This timesaving helps to decrease the client’s general construction costs.

Low running costs
The use of a timber / wooden frame, modern insulating materials and wind barriers helps to produce houses that are well insulated and wind-proof. Out partners offer tight and well-insulated windows as well as balcony and external doors. Along with professional assembly and sealing of element joints we can offer our clients houses with low energy consumption and low running costs.